Railway Recruitment Kolkata, RRB Group D 32000 Vacancy Pdf
To begin with, the Jai Hind metro station was planned for being elevated. On the other hand, the AAI objected the elevated stretch up into the airport may possibly pose a menace to aircraft, Therefore the route was even further reworked and the station was shifted underground, 150 m through the Airport terminal making.To begin getting timely alert